E3 Failover (E3 Protection) Switch
Orion Telecom Offers Power Utility Solutions Oil & Gas Networks Solutions Railway & Metro Rail Solutions PTP IEEE-1588v2 GPS Primary Reference Clock Packet Optical Transport Multiplexers Teleprotection SCADA, FOTE, OLTE Digital Cross Connects Echo Cancellers IP/Ethernet over TDM 1+1 APS (Fail-Over) Solutions Monitoring Groomer Solutions
Product Overview
E3 Fail Over (E3 Protection) Switch - Upto 2 x E3 Links
Orion's E3 Fail Over (E3 Protection) Switch allows the user to connect a single E3 line from the telephone company to an "active", as well as to a "standby" E3 terminal, such as data server / router etc., at the customer premises.
E3 Failover (E3 Protection) Switch - Data Sheet
Features and Highlights
- Allows the user to connect a E3 line from the Telephone Company and to switch it automatically between an active and a standby E3 terminal at the customer premises. The switching criterion is Loss Of Signal.
- Available in a single E3 line and a two E3 line version.
- Independent switching for each E3 line (in 2 x E3 line version).
- Built-in real-time clock / real-time logging maintains a history of all events.
- Remotely accessible over a TCP-IP networks. Allows the user to access and carry out maintenance, or / and switch the E3 line between the "active" and "standby" E3 terminals, remotely, if required.
- Dual AC (1+1 AC), or Dual -48V DC (1+1 DC) power supply inputs.
- Allows the users to install and maintain active/standby/duplicate customer premises data networks/data servers, without bearing the recurring $$ expense of leasing additional expensive E3 lines from the telephone company.
- Automatically switches the E3 link from the Telephone Company between the "active" and "standby" E3 equipment at the customer premises, according to the customer-defined criterion.
- Improves equipment and data security.
- Allows the user to co-locate the "backup / standby" equipment in a different room/building and prevent any data loss arising out of conditions of natural calamity such as fire, flooding etc.
- Increases the reliability of the customer's data/IT networks without having to bear the recurring and additional cost of leasing additional E3 lines from the telephone company. The equipment may be used to create secondary/backup systems at the customer premises to provide virtually uninterrupted service.
How it works?
In the event of the failure of the data server / router connected to the "A / active" port of the E3 Protection (Fail-Over) Switch, it shall automatically switch and connect the E3 line from the telephone company to the data server / router on the "B / standby" port. This ensures minimum downtime - which would have otherwise occurred due to equipment failure connected to the "A / active" port. This equipment may be used to enhance the reliability and the efficiency of the customer's data network.
Application Note
The E3 Fail-Over Switch should be used when the customer is using a single E3 line and install "active" E3 equipment and "standby" E3 equipment (such as a ROUTER) at the customers premises. The E3 Fail-over Switch shall automatically switch the E3 line from the telephone company between the ACTIVE E3 data server / router and the STANDBY E3 data server / router. Should the ACTIVE E3 data server / router fail or be removed from service, the E3 line from the telephone company automatically switches to the STANDBY E3 data server / router without requiring any customer or user intervention.
E3 Failover (E3 Protection) Switch - Data Sheet
Application Diagrams
Applicaton # 1
Telco E3 Line Connected to Equipment - A
Upon failure of Equipment - A, the E3 Telco line automatically switches to standby Equipment - B.
Applicaton # 2
Equipment - A Fails - Telco E3 automatically switches to Equipment - B
Applicaton # 3
Equipment - A recovers - Telco E3 automatically switches to Equipment - A